This project consists of the construction and commissioning of a reinforced concrete pump station with three Boosterpaq 60Hz water pumps. Along with the connection to an existing pump station, the watermain construction consists of approximately 440m of 400mm pipe, crossing Island HWY, associated valves, fittings and tie-in to existing mains.